Radiative Cooler Bypass
EAF Off-Gas System Modifications Engineering
Client: ArcelorMittal Dofasco
Location: Hamilton, ON Canada
Engineering to define and implement modifications to the EAF primary off-gas cooling system to eliminate the existing radiant cooler and convert to full evaporative cooling.
Scope of Work:
- Finalize process design basis, PFD, and control philosophy
- Define, specify and size major equipment for project
- Develop basic general arrangement drawings of the proposed equipment layout and ductwork routing
- Provide commissioning and startup services
Project Results:
- Modifications allowed for decommissioning of cooler and booster fan
- Reduced operating costs
- Reduced maintenance costs
- Improved draft to the EAF
Project History
Study Complete
Detailed Engineering
Startup
August 2014
February 2015
December 2015