Relocated Baghouse in Operation

New Baghouse During Construction
Electric Smelting Furnace Off-Gas System Design
Client: Glencore
Location: Dominican Republic
Preliminary and Detail Design and Commissioning of a New Off-Gas System for 2 Electric Smelting Furnaces.
- Primary and Secondary Fume Collection Design
- Two 124,000 ACFM Pulse Jet Baghouse—1 Relocated Baghouse and 1 New Baghouse
- Detail Engineering – Process, mechanical, and civil/structural
- Equipment Sizing, Specification Preparation, and Bid Evaluation
- Total Drawings: 50
- Commissioning and Performance Testing
Project History
Basic Engineering
Detail Engineering
Startup
Hot Commissioning
May 1998
May 2002
July 2005
July 2005