Converter Retrofit Project (ASARCO)

Converter Retrofit Project Client: ASARCO Location: Hayden, ArizonaLandmark EPA legislation created new ground level  NAAQS. This standard imposes limitations for smelter operations to be [...]

Anode Furnace Off-Gas System (ASARCO)

Anode Furnace Off-Gas System Client: ASARCO Location: Hayden, ArizonaEngineering, Design and Construction Management of a new Anode furnace off-gas system. Design Includes: Installation of [...]

Hood Design and Supply

Hood Design and Supply Client: Codelco Caletones Location: ChileDesign and Supply of a New Water-Cooled Primary Hood System for a Peirce-Smith Converter: Design new water-cooled hood for a CPS [...]

Anode Furnace Off-Gas System (Mexicana de Cobre)

Anode Furnace Off-Gas system Client: Mexicana de Cobre Location: La Caridad, MexicoConceptual and Basic Engineering of a new anode furnace off-gas system. Design Includes: Installation of [...]

Copper Smelter Emissions Reduction Study (Mexicana de Cobre)

Copper Smelter Emissions Reduction Study Client: Mexicana de Cobre Location: La Caridad, Nacozari, MexicoScoping Study for Reduction of Roofline and Stack Emissions of SO2 and particulate. Study [...]

Rotary Kiln 4 Off-Gas Upgrade Study and Basic Design (PT Vale)

Rotary Kiln 4 Off-Gas Upgrade Study and Basic Design Client: PT Vale Location: IndonesiaConceptual Study and Basic Engineering to Upgrade Kiln 4 ESP system to meet 50 mg/Nm3. System capacity [...]

Electric Smelting Furnace Off-Gas System Design (PT Vale)

Electric Smelting Furnace Off-Gas System Design Client: PT Vale Location: IndonesiaPreliminary and Detail Design and Commissioning of a New Off-Gas System for 4 Electric Smelting Furnaces. [...]

Electric Smelting Furnace Off-Gas System Design (BHP Billiton: Cerro Matoso)

Electric Smelting Furnace Off-Gas System Design Client: BHP Billiton—Cerro Matoso Location: ColombiaPreliminary and Basic Engineering of a New Off-Gas System for Electric Smelting Furnace #1 and [...]

Rotary Kiln 1 Off-Gas 2nd Scrubber Addition (BHP Billiton Cerro Matoso)

Rotary Kiln 1 Off-Gas 2nd Scrubber Addition Client: BHP Billiton Cerro Matoso Location: ColombiaConceptual Study, Basic and Detailed Engineering to Upgrade Kiln 1 off-gas system capacity by [...]

Tankhouse Acid Mist Control Conceptual Engineering (BHP Billiton: Minera Escondida

Tankhouse Acid Mist Control Conceptual Engineering Client: BHP Billiton - Minera Escondida Location: ChileConceptual engineering of improvements to cell house ventilation to reduce acid mist. [...]

page 1 of 2