Client: NatSteel
Location: Singapore
Installation of an Organic Rankine Cycle (ORC) system for a single Reheating Furnace (RHF) application, incorporating direct heat exchange ORC technology and optimization of layout and ductwork.
Project Includes:
- Installation of ORC system
- Single RHF application
- Direct Heat Exchange ORC
- Power production: up to 0.6 MW
- Cooling system design
- Layout and ductwork optimization
Project Outcome:
- Construction completed within 17 months after receipt of order (ARO)
- Zero reported accidents or incidents
- Commissioning and start-up period: January 2013
Engineering/Procurement/Construction 2010-2012
In Operation 2012-2014
Recommissoning/Restart March/April 2025